Indra Bastian, Hadyan Fadillah
Gadjah Mada University, Yogyakarta, Indonesia
Cite: Bastian I. , Fadillah H. Machine Maintenance Policies in Local Sugar Manufacturing: A Case Study of Madukismo, Indonesia. J. Digit. Sci. 5(1), 23 – 32 (2023). https://doi.org/10.33847/2686-8296.5.1_3
Abstract. This study aimed to analyze the factors that cause un-optimal on a maintenance of machinery in P.G Madukismo. An engine maintenance which was carried out by P.G Madukismo for 6 months, had not been able to suppress an engine stop time. In 2016 the planned engine stop time in P.G Madukismo was on 88.8 hours, but in reality the P.G Madukismo engine stopped clock reached on 179.44 hours during a milling season. By exploring a case study approach, data collection was examined by interviews, observation and documentation. The data collected was analyzed using the reduction, data presentation and concluding withdrawal stages. The results of this study indicated that the main factors that caused engine maintenance had not been optimal because the useful life of the machine had been exhausted and preventive maintenance that was carried out cannot replaced all engine components that were damaged or worn. In addition, P.G Madukismo also did not have a SOP related to machine maintenance. Efforts that had been made to optimize machine maintenance were preventive maintenance, which was carried out not only outside the milling season but also during the milling season and provided training to employees to improve employee capabilities.
Keywords: machine maintenance, stop time.
References
- Mandiri Institute. 2016. “Industry Update Office of Chief Economist: Gula”. Vol 10, May2016.
- Cahyadi, Arif Yuni. 2015. “Pengukuran Produktivitas PG Madukismo PT Madubaru Menggunakan Metode Objective Matrix (OMAX).” Thesis. Yogyakarta: Gadjah Mada University.
- Assauri, Sofjan. 2004. Manajemen Produksi dan Operasi. Jakarta: Publisher of Ekonomic Faculty, University of Indonesia.
- Gaspersz, V., 2002. Total Quality Management. Jakarta: Gramedia Pustaka Utama.
- Ramadhan, Sri Afni. 2010. “Analisis Pemeliharaan Mesin-Mesin Pembangkit Listrik Tenaga Gas (PLTG) Pada PT PLN (Persero) Ranting Pekanbaru”. A Thesis. Pekanbaru: Moslem State University of Sultan Syarif Kasim Baru.
- Bastian I., PetrusLate K.P. Late in Inka Mina Ship Procurement: A Case of North Celebes, Indonesia. J. Digit. Art Humanit. 4(1), 19-30, (2023). https://doi.org/10.33847/2712-8148.4.1_3 .
- Asadayanti, Fadhillah. 2013. “Evaluasi Penerapan Elemen Pengendalian Internal COSO, dalam Aktivitas Pemeliharaan Peralatan Penunjang Fasilitas PT. Sawokembar Galeria Yogyakarta.” Thesis. Yogyakarta: Gadjah Mada University.
- Miles, M.B., & Huberman, A.M. 1994. Qualitative Data Analysis. London: SAGE.
- Sugiyono. 2014. Metoda Penulisan Kuantitatif Kualitatif Dan R&D. Bandung: Publisher Alfabeta.
- Nababan, Manaor Bismar. 2013. “Efisiensi Produksi Pabrik Gula Nasional”. A Thesis. Bogor: Bogor Agricultural Institute.
- Agustinus, Michael. 2016. “Produksi Gula Terus Turun, RI Kini Jadi Importir Gula”. Accessed on March 17, 2018. https://finance.detik.com/industri/d-3117318/produksi-gula-terus-turun-ri-kini-jadi-importir-gula.
- Ermanwijaya, Masri. 2017. “Efisiensi Biaya Produksi Gula Berdasarkan Activity Based Management System pada PT. Gunung Madu Plantations IX Gunung Batin Lampung Tengah”. Journal of ACSY Sekayu Polytechnic Vol VI.
Published online 25.06.2023
